Triassic - Major Overhaul

10-year Overhaul Started

In the UK, steam locomtives are required to be stripped down and thier boilers lifted to enable a full examination of all aspects of the boiler and firebox to be made. This is mandatory, stipulated by boiler insurance and the UKs Heath & Safety environment.

In 2003, the railway signed a new agreement with Bryce Latham for Triassic to be used at Bala for 5 years after completion of the steam test after completion of the loco's 10-year overhaul.

Triassic, minus cab, tank and cladding - copyright Ben Abbott
Triassic, minus cab, tank and cladding - copyright Ben Abbott


The work, on Triassic, commenced in the winter of 2003 when Triassic was stripped down to a kit of parts and by early 2004 the frame had been placed onto a flat wagon awaiting work to start on the horn guides.

Slow Progress

The overhaul has progressed slowly, between the other more urgent calls on workshop time - the annual winter maintenance of Alice, Holy War, Maid Marian, Bob Davies and the return to service of Chilmark and Merionnydd. Other work such as carriage and wagon repairs and refurbishments have slowed down the work on Triassic.

Triassic, stripped down and the frame receives coat of green oxide paint copyright Ben Abbott
Triassic, stripped down and the frame receives coat of green oxide paint copyright Ben Abbott

The insides of the frames were given a coat of undercoat during May 2006, and the outsides prepared for painting.

By June 2006, Triassic's boiler had been given a coat of paint and was awaiting a visit from the boiler inspector to determine what condition itwas in. Meanwhile, the frames were receiving attention, were painted outside and inand the connecting rods refitted.

Treiassic boiler painted and complete with new tubes awaits the boiler inspector June 2008 copyright Ben Abbott
Triassic boiler painted and complete with new tubes awaits the boiler inspector June 2008
copyright Ben Abbott

End in Sight

June 2008 and the boiler has been re-tubed and is almost ready to be re-united with the frames and the loco should be back in service for the 2008 Santa Train weekend (because both Holy War and Alice will be in the works for overhaul this winter).